Electric vehicle (EV) adoption is growing rapidly, and with it comes the need for convenient home charging solutions. Many EV owners turn to specialized energy and installation providers, such as Octopus Energy, to set up their home charging stations. But one of the most common questions is: How long does Octopus take to install an EV charger?
The answer depends on several factors, including the type of charger, your home’s electrical setup, and scheduling availability. In this article, we’ll break down the installation process, typical timelines, and what you can expect when booking an EV charger installation with Octopus Energy.
Understanding Octopus Energy’s EV Charger Installation Process
Octopus Energy, a UK-based renewable energy provider, offers smart EV chargers (such as the Ohme Home Pro) along with professional installation services. The process generally follows these steps:
1. Choosing Your EV Charger
Octopus provides different charger options, including smart chargers that optimize charging times for cheaper electricity rates (e.g., during off-peak hours).
2. Site Survey (If Required)
- Some homes may need a pre-installation survey to assess electrical compatibility.
- This step can take a few days to a week, depending on availability.
3. Booking the Installation
- Once approved, you’ll schedule an installation date.
- Wait times vary but typically range from 1 to 4 weeks, depending on demand.
4. Installation Day
- A certified electrician will install the charger, which usually takes 2 to 4 hours.
- If additional electrical work (like a new circuit) is needed, it may take longer.
5. Testing & Activation
- The installer will test the charger and ensure it’s connected to your Wi-Fi (for smart chargers).
- You’ll receive instructions on how to use the charger and any associated apps
How Long Does the Entire Process Take?
From initial order to full installation, the timeline can vary:
Step Estimated Timeframe Ordering & Initial Assessment 1–3 days Site Survey (If Needed) 3–7 days Installation Booking 1–4 weeks Actual Installation 2–4 hours Total Estimated Time 2–6 weeks Factors That Can Affect Installation Time
- Electrical Upgrades Needed
- If your home requires a new circuit or fuse box upgrade, this can add extra time (possibly another week).
- Charger Type
- Basic chargers may install faster than smart chargers that require Wi-Fi setup.
- Location & Accessibility
- If the charger is installed far from your electrical panel, cable routing may take longer.
- Installation Provider Workload
- High demand can lead to longer wait times for booking.
Can You Get Same-Day or Next-Day Installation?
In some cases, Octopus Energy or its partners may offer faster installations (within a week) if:
✅ Your home’s electrical system is already EV-ready.
✅ There are available slots with local installers.
✅ No major upgrades (like a new consumer unit) are needed.However, same-day or next-day installations are rare unless you’re in an area with high installer availability.
Tips to Speed Up Your Octopus EV Charger Installation
- Check Your Electrical System in Advance
- Ensure your fuse box can handle the extra load.
- Choose a Simple Installation Location
- The closer to your electrical panel, the faster the installation.
- Book Early (Especially During Peak Times)
- EV charger demand is high, so scheduling ahead helps.
- Opt for a Standard Smart Charger
- Custom setups may take longer.
-
Alternatives to Octopus Energy Installation
If Octopus has long wait times, you might consider:
- Other certified installers (like Pod Point or BP Pulse).
- Local electricians (ensure they are OZEV-approved for government grants).
What to Expect During Installation
On the day of installation, the electrician will:
Post time: Apr-10-2025 - Check Your Electrical System in Advance
- High demand can lead to longer wait times for booking.
- Location & Accessibility
- Basic chargers may install faster than smart chargers that require Wi-Fi setup.
- Electrical Upgrades Needed